Diploma Industrial Engineering and Management Important Questions Unit 2

Diploma Industrial Engineering and Management Important Questions

Dear Students

We have added Diploma Industrial Engineering and Management Important Questions Unit 2 for the diploma mechanical III year / VI Semester as PDF 

Join our WhatsApp Group and telegram channel to get regular updates

Join Diploma Exam Corner
WhatsApp group Click here
Telegram Channel Click here
YouTube Click here
Govt Job Updates Click here

TamilNadu Diploma Semester Reopen Date announced – CLICK HERE

Unit – 2 – WORK STUDY, METHOD STUDY AND WORK MEASUREMENT

Note :

1. Highlighted Questions are asked more than two times

2. These questions are collected from last three years board examination question papers

2 marks / 3 marks.

  1. What are the methods of increasing Productivity?
  2. Define Method study
  3. Name the allowance which is not used for calculating standard time.
  4. Define Employee Rating factor.
  5. Define Productivity
  6. What is PMTS?
  7. Explain briefly about string diagram,
  8. Describe the procedure in making a time study.
  9. Write any two objectives of work study.
  10. Draw the symbols used for representing temporary storage & storage in process   charts
  11. Explain with Block Diagram how standard time is calculated.
  12. Define allowances
  13. Define Productivity and Standard of living.
  14. What is meant by policy allowance?
  15. State the objectives of Method study
Diploma Industrial Engineering and Management Important Questions
Diploma Industrial Engineering and Management Important Questions

10 marks

  1. Explain Man- Machine Chart.
  2. Write down the different allowances used in calculating standard time and explain.
  3. Explain Two handed process chart with a neat sketch.
  4. Write Short notes on (i) analytical estimating (ii) synthesis from standard data.                                                 (iii) Ratio – Delay study.
  5. What are the various means by which productivity can be increased? Briefly explain each.
  6. Write short notes on (i) Analytical Estimating (ii) Employees Rating Factor
  7. Explain in Detail the steps involved in time study
  8. With a block diagram, Explain how the standard time for a job is determined
  9. Explain the basic procedure of method study
  10. Expalin Various allowances applied to stop watch time study.
Diploma Industrial and Management Important Questions 
Unit 1 Click here
Unit 2 Click here
Unit 3 Uploading
Unit 4 Uploading
Unit 5 Uploading

Leave a Comment

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

error: Content is protected !!